Skip to content

Example POC Roadmap

A Rilla POC uses stage gates to keep testing and rollout decisions tied to evidence.

  1. Initiation and Alignment

    Objective

    Establish commercial and technical foundation

    • NDA executed
    • Use case and target scenario defined (for example, live sports event)
    • Initial technical scoping completed (integration path, constraints)
    • Stakeholders aligned (product, engineering, commercial)
    Exit criteria
    • Agreed POC scope
    • High-level integration approach confirmed
  2. Integration Setup (Target Platform)

    Objective

    Integrate Rilla into a controlled, representative environment

    • Target platform and player selected
    • SDK integrated into player environment
    • Core requirements enabled:

      • Feature flag or controlled rollout
      • Access to test stream
      • Telemetry and CDN data access
    Exit criteria
    • Successful playback with Rilla enabled
    • Environment ready for controlled testing
  3. QA and Validation

    Objective

    Ensure playback safety and baseline performance

    • Playback stability verified (no regressions vs CDN baseline)
    • Guardrail metrics validated (TTFF, rebuffer, drop rate, etc.)
    • Device performance within acceptable limits
    • Limited rollout approved (internal or small percentage of users)
    Exit criteria
    • All QoE guardrails within agreed thresholds
    • Approved to proceed to live traffic testing
  4. Live Testing (POC Execution)

    Objective

    Validate performance under real-world scale and conditions

    • Trial executed at meaningful concurrency (CCU target reached)
    • Peak traffic window tested
    • CDN deflection and peer performance measured
    • System behavior observed under churn (joins and leaves)
    Exit criteria
    • Reliable data collected across all success metrics
    • No critical stability or performance issues
  5. Evaluation and Production Decision

    Objective

    Determine readiness for rollout

    • Joint review of results across Rilla and deployment stakeholders
    • Performance versus success criteria evaluated:

      • Deflection achieved
      • QoE guardrails maintained
      • Operational feasibility confirmed
    • Production rollout recommendation defined:

      • Proceed to rollout
      • Iterate and retest
      • Defer